biogas project usingwastewater from palm mill and rubber factoryas feedstock. It is the cooperation between Thachang Oil Palm Industry Co., Ltd., Thachang Rubber Co., Ltd and TBEC under BOOT contract. The project started operation in early 2009. In late 2009, TBEC decided to increase the capacity of the Project from 1.4 MW to 2.8 MW. The project was registered as a CDM projects inOctober2010.It has been developed, designed, constructed and operated in accordance with Gold Standard criteria.