We recommended a new HVAC system to the install outside roof CCR Control Room. (In Cloud mark). South side with Package air conditioning cooling capacity 50 ton x 2 ea .
About duct work recommend use existing duct for SA , RA , FA in main branch but,duct work install outside to package air conditioning have make new duct.