If welding work is performed on the piping system, do not ground the welding appliance
through the Promag flowmeter. The installer must ensure that the measuring system is correctly wired in accordance with the wiring diagrams. The transmitter must be grounded, unless the power supply is galvanically insulated. Invariably, local regulations governing the opening and repair of electrical devices
apply.