Please find herewith attached a mechanical endurance test carried out on 72.5 kV DS, but we do not have the same with TR216 post insulators.
The aim of mechanical endurance test is to verify that the main contacts of DS after 1000(M0) operations are not damaged, and this is independent from the type of used post insulators