In case of screened goods the TCF preparator picks the box of the production order and fills the stones into the final packag-ing. At the beginning and end of this step the start and end date and time, the personnel number and the production order num-ber are entered into the PDS (Step: rasterize, labor time). After-wards the filled packages are put into boxes with the production order paper and the boxes are stored at the entrance of the TCF production area.