8.9 As outlined in Section 3 of this document, the two main options for this infrastructure are (i) additional pipelines to connect into the main UK gas pipeline network and (ii) on site electricity generation which is then connected into the national grid. Under either approach a substantial body of additional labour and equipment is required to put in place the necessary infrastructure, which will grow in scale as the number of wells in any one location increases.