The client has incurred extra costs in the delivery of steel structures drawings and M&E coordination. In order to get a fruitful meeting tomorrow, please be prepared and look into the below items including but not limited to:
a) Lift support details including lifting hook connection, intermediate side beams for guide rail connection, point load to the lift pits and etc.
b) SSL levels, slab thickness, slope, oil drains depth and the drain holes at the workshop area (3rd Floor). The designed beams levels need to be lowered to as the FFL remained as per architect's design. Furthermore, the oil drains sit directly on top of the secondary beams along GL. A~B and GL. 3~4. Kindly explore if we can offset the obstructing beams for 150mm away from the center of the affected oil drain.
c) People using Staircase 3 coming up from 2nd Floor to 3rd Floor will not have enough headroom due to the obstructing main beam at GL. 7/A. Please review the beams arrangement again.
d) All other levels with coordination between architectural levels and M&E requirements.
The client has incurred extra costs in the delivery of steel structures drawings and M&E coordination. In order to get a fruitful meeting tomorrow, please be prepared and look into the below items including but not limited to:
a) Lift support details including lifting hook connection, intermediate side beams for guide rail connection, point load to the lift pits and etc.
b) SSL levels, slab thickness, slope, oil drains depth and the drain holes at the workshop area (3rd Floor). The designed beams levels need to be lowered to as the FFL remained as per architect's design. Furthermore, the oil drains sit directly on top of the secondary beams along GL. A~B and GL. 3~4. Kindly explore if we can offset the obstructing beams for 150mm away from the center of the affected oil drain.
c) People using Staircase 3 coming up from 2nd Floor to 3rd Floor will not have enough headroom due to the obstructing main beam at GL. 7/A. Please review the beams arrangement again.
d) All other levels with coordination between architectural levels and M&E requirements.