(2) The plant in Gran Canaria was built
in 1995, combining constructed wetlands and maturation ponds.
Research has shown optimal BOD removal on the gravel filter and
better nitrogen elimination on the pond although its best results
are attributed to the combination between microorganisms from
both environments (Herrera et al., 2009).