Risk Management Measures
Contributing Scenarios
General exposures (closed systems) .
No other specific measures identified .
Bulk transfers . ; Non-dedicated facility
No other specific measures identified .
Use in contained systems .; Automated process with (semi) closed systems
No other specific measures identified .
Use in contained systems .; Automated process with (semi) closed systems ; Drum/batch transfers .
No other specific measures identified .
Application of cleaning products in closed systems
No other specific measures identified .
Filling / preparation of equipment from drums or containers. .; Dedicated facility
No other specific measures identified .
Use in contained batch processes .; Treatment by heating .
No other specific measures identified .
Degreasing small objects in cleaning station .
No other specific measures identified .
Cleaning with low-pressure washers .
No other specific measures identified .
Cleaning with high pressure washers .
Provide a good standard of general ventilation (not less than 3-5 air changes per hour) . Avoid carrying out activities involving exposure for more than 4 hours . Wear suitable gloves tested to EN374 .
Cleaning .; Surfaces .; No spraying .; Manual .
No other specific measures identified . Section 2.2 Control of environmental exposure Operational conditions
Amounts used
Maximum daily site tonnage (kg/day): 5000
Frequency and Duration of use/exposure
Emission days (days/year): 20
Environmental factors not influenced by risk management
Local fresh water dilution factor: 10 Local marine water dilution factor: 100
Other Operational Conditions of use affecting environmental exposure
n/a Risk Management Measures
Technical conditions and measures at process level (source) to prevent release
n/a
Technical onsite conditions and measures to reduce or limit discharges, air emissions and releases to soil
n/a
Organisation measures to prevent/limit release from site
Site should have a spill plan to ensure that adequate safeguards are in place to minimize the impact of episodic releases.
Conditions and measures related to municipal sewage treatment plant
STP: 3 Estimated substance removal from wastewater via domestic sewage treatment (%): 87.3 (default from Simple treat model) STP4: Total efficiency of removal from wastewater after onsite and offsite (domestic treatment plant) RMMs (%): 87.3
Conditions and measures related to external treatment of waste for disposal
Dispose of waste solvent and used containers according to local regulations
Conditions and measures related to external recovery of waste
Storage of finished products in closed containers (e.g., bulk tanks,, drums, cans). Incinerate, absorb, or adsorb vapours stripped from solution whenever necessary.
Other environmental control measures additional to above
Vapour recovery units should be used when necessary.