Risk is the product of (1) frequency, (2) probability, and (3) severity.
Frequency is a determination of how often we perform a
task, and probability is how likely it is that an injury event would
occur. Severity defines how significant the losses would be if the
event actually occurred. The team should be calibrated on how to
evaluate hazards in order to effectively assess the risk.