Since the storage life is relatively short, the linking of production to service is much tighter than what is needed in cook-freeze operations. In general, the production unit would generally produce food for a known predicted demand 2 3 days in advance, working consistently to the predicted requirements. Unpredicted variations in demand will tend to produce either much higher wastage or greater shortages in the catering system than might be encountered ir a cook-freeze operation.