The IDM quote is to replace the decking as per UniDesign.
I thought I had to get a NEW quote based on the Stage 2 design drawing L-105 from K. Bua at Duangrit’s office and get IDM to quote asap. Only the decks at the building ends.
Could you chase up the Drawings L-105 and I will sort out ?