Since it is a design criteria for road drainage and sewer systems, the infiltration performance of permeable concrete block pavement (CBP) is of important significance during the service life of a road construction. Due to the entrainment of mineral and organic fines into the pores of porous concrete blocks or into the aggregates used in joints or openings, the irreversible reduction of water permeability can be assumed. Research results show that the infiltration performance decreases in the order of the power to ten after a few years.