We need to install 4 additional manual valves at the CIP plant and 3 strainer in the outlet pipe of the IBC station. Material to be provided by Miteco.
I need to have from you on an urgent base an offer for these works. Keep in mind that the main installation works will have been completed by the time they have placed an order and the parts have been shipped. Assume 4 – 6 weeks from now. It is not a big job, but safety and all this needs to be considered from scratch again.