The preliminary results in a case study (with 1 CDC, 10 LDC, and more than 400 repair shops) demonstrate that the total operation time, from current stage to future stage with integration of lean and RFID, can be saved by 81% (with 82% saving in waiting and transportation time and 63% saving in value-added time).