Hourly load demand, kW
The load demand in Aswan city have been evaluated along one complete year of operation, for each month a reference day has been constructed. Fig. 4 shows some ofnthe assumed load demand during January, April, July and October. The minimum and maximum loads are set to 2000 kW and 4000 kW respectively with an average load demand of 2481.11 kW. Yearly energy demand equal to 10.465 GWh.