While a considerable amount of engineering and design work
had gone on before the announcement, to assure the feasibility
of the project, a period of 3 years was actually available to basically
engineer, design, and construct the system. The first order
of business was the development of project schedules and the
organization of the engineering and design problems into a
rational order and then into a priority list. Basically, the first
year was used to solve the underlying engineering and design
problems, detailed design and engineering were handled in the recommended and approved by the Substations
Committee of the IEEE Power Group for presentation at the
IEEE Winter Power Meeting, New York, N. Y., January 26-31,1969.
Manuscript submitted September 16, 1968; made available for printing
December 9, 1968.
The authors are with the American Electric Power Service Corporation,
New York, N. Y. 10004.
ในขณะที่จำนวนมากของวิศวกรรมและงานออกแบบที่ได้ไปก่อนการประกาศเพื่อให้มั่นใจความเป็นไปได้ของโครงการระยะเวลา3 ปีที่ผ่านมาก็มีจริงโดยทั่วไปวิศวกรออกแบบและสร้างระบบ สั่งซื้อครั้งแรกของธุรกิจคือการพัฒนาของตารางเวลาของโครงการและองค์กรของวิศวกรรมและปัญหาการออกแบบให้เป็นคำสั่งที่มีเหตุผลแล้วลงในรายการลำดับความสำคัญ โดยทั่วไปเป็นครั้งแรกในปีที่ถูกนำมาใช้ในการแก้วิศวกรรมและการออกแบบพื้นฐานปัญหาการออกแบบรายละเอียดและวิศวกรรมถูกจัดการในการแนะนำและอนุมัติโดยSubstations คณะกรรมการของกลุ่มพลังงาน IEEE เพื่อนำเสนอที่ประชุมพลังงาน IEEE ฤดูหนาว, New York, NY, . มกราคม 26-31,1969 ต้นฉบับส่ง 16 กันยายน 1968; ทำให้พร้อมสำหรับการพิมพ์วันที่ 9 ธันวาคม 1968 ผู้เขียนอยู่กับผู้ให้บริการพลังงานไฟฟ้า บริษัท อเมริกัน, New York, NY 10004