● Tack weld at joint between steel plate at bottom of pc beam and steel support on
column for adjust plumb and alignment.
● Center line of pre-cast concrete beam must be stay on true position.
4.5.4 After completed setting the pre - cast concrete beam shall be complete weld joint around
connection joint.
4.5.5 Touch up the anti - rust paint damaged.