Both procedures differ in the suitable size and
weight of the assembly elements. Cranes can easily
lift large and therefore bulky construction
elements across the construction site. Mobile
robots must be able to move inside the building,
which limits their weight due to the carrying
capacity of the ceilings and their size due to the
dimension of the rooms and doors