1.The position of cable trough shall be placed according to actual site.
2.Total installed power 250kw.
3.Power supply three phase, four wire 380v. 50Hz.
4.The steel plate under extruder platfrom and T-die hoisting frame is on the cement ground plane.
The steel place is supplied by the seller.
5.The ground shall be 200m.m. Depth concrete, with bearing 2000kg./sqm.
6.The air source shall be 0.6Mpa., 0.05m3/min above dry and clean air.