Peak load plans. Plans used to supply the peak load of the system corresponding to the load at the top portion of the load curve are known as peak load plants. Run off river plants with pondage can be used as peak load plants. If the pondage is enough,a larger portion of the load can be supplied by such a plant if and when required. Reservoir plants with enough storage behind the dam can be used either as base load or peak load plants as required.