According to CGD material comments, The finishing of entry and footpath is black granite polished. (HI’s proposed, see the attached)
The level –3.90m. indicated on Architectural drawing mean to FFL., However, this area is ID scope of work. Therefore, the materials and gap provides to be confirmed by PIA.