Refer to the power outage incident occurred on Wednesday 25th around 13.25hrs, MEA clarified that it was caused by an accident happened to MEA’s cables. During the blackout period, the backup power generator generated the emergency power and supplied to the emergency system such as emergency lighting in common area, standby lift, fire alarm system, fire pump system etc. including the hooked unit.
The overall power supply later resumed to normal operation around 14.25hrs.
We have enclosed MEA’s letter dated 25th January 2012 for your reference.