Monthly Ore versus waste stripping ratio are monitoring; recent month pit material was removed total 4,901,588 tons. Divided into 4,237,487 tons waste and 664,110 tons ore therefore current pit operating at 1 : 6.38 stripping ratio.
Monthly Ore versus waste stripping ratio are monitoring; recent month pit materialwas removed total 4,901,588 tons. Divided into 4,237,487 tons waste and 664,110tons ore therefore current pit operating at 1 : 6.38 stripping ratio.