The Hauenstein line is a major railway line in Switzerland connecting the cities of Basel and Olten.
The original line was built between 1853 and 1858 under the Unterer Hauenstein Pass, an ancient pass through the Jura Mountains, including a 2,495 metres (8,186 ft) long tunnel under the village of Hauenstein. Between 1912 and 1916 a new line with an 8,134 m (26,686 ft) long base tunnel was built further east, by-passing the steeper sections of the line.
Normally long-distance trains use the base tunnel line, and the old summit line is only used by trains serving the local people (Läufelfingerli). Sometimes during disruptions inter-city trains operate on the old line, but it is reasonably fast and diverted trains take only about four minutes longer than normal services. Freight trains rarely use the summit line because its large gradients.
สาย Hauenstein เป็นทางรถไฟสายสำคัญในการเชื่อมต่อวิตเซอร์แลนด์เมืองบาเซิลและออลเทน.
สายเดิมถูกสร้างขึ้นระหว่าง 1853 และ 1858 ภายใต้ Unterer Hauenstein ผ่านผ่านโบราณผ่านเทือกเขาจูรารวมถึง 2,495 เมตร (8,186 ฟุต) อุโมงค์ใต้หมู่บ้าน Hauenstein ระหว่าง 1,912 และ 1,916 สายใหม่ที่มี 8,134 เมตร (26,686 ฟุต) อุโมงค์ยาวฐานถูกสร้างขึ้นทางทิศตะวันออกต่อไปโดยผ่านส่วนชันของเส้น. โดยปกติรถไฟทางไกลใช้บรรทัดอุโมงค์ฐานและสายการประชุมสุดยอดเก่า ใช้เฉพาะโดยรถไฟให้บริการประชาชนในท้องถิ่น (Läufelfingerli) บางครั้งในระหว่างการหยุดชะงักรถไฟระหว่างเมืองทำงานในสายเก่า แต่มันก็เป็นเหตุผลที่รวดเร็วและเบี่ยงเบนรถไฟใช้เวลาเพียงประมาณสี่นาทีนานกว่าบริการปกติ รถไฟบรรทุกสินค้าไม่ค่อยใช้สายประชุมสุดยอดเพราะการไล่ระดับสีขนาดใหญ่
การแปล กรุณารอสักครู่..