The control center of the network collects
the system state of an electric power system through remote
terminal units (RTUs), for the processing and decision
making. Data transmitted to the control center should be
accurate and reliable enough for controlling a power system.
In order to have a reliable and accurate system state, the
utilities need to upgrade their SCADA system and install more
real-time measurements.