Risk wise the design with stand by equipment
definitively limits the risk. The 3% with high risk
and major impact refers to the CHW distribution
with a single pump only (See Pictures 5). During
the site visit the second pump was removed. In
case of a pump’s problem, which is foreseeable
due to the pump’s age, the entire chilled water
distribution and the related air conditioning in the
common areas will be down.