The micro hydro required special
consideration in that it had to be
assigned a priority to either backup or
generate whenever the batteries need
charging, 8s it could be part of an
irrigation system (Figure 5). Another
factor which- had to be considered was the
availability of water and the possible
runaway of the turbine under unloaded
conditions,