THE SOLUTION
The plant is equipped with the following procedural units. The fuel is
delivered by trucks. Beginning with the receiving station consisting of 2
moving floors the fuel is conveyed into 4 storage silos. From there the
fuel arrives in the boiler area via a multi stage conveying system.
The thermal part consists of grate firing system. steam generator and
flue gas cleaning.
In addition to the technical equipment of the power plant as: back
pressure steam turbine, water- /steam cycle, electrical instrumentation
and control system also the complete civil part including all auxiliary
buildings were belonging to Standardkessel’s scope.