During the operation, SBES was subjected to chronoamperometry
(CA) analysis by maintaining a steady potential (1.2 V). CA enumerates
the utmost possible sustainable current during the SBES
operation. Gradual increment in current was observed in CA profiles
from 0th day to 15th day of SBES operation where decreasing
trend was observed from 20th day to till the end of operation