1) Review risk assessment for seat assembly.( motion for working )
2) Improve mechanism of lever clamp of HR jig, 2.1 add stopper to protect level move to unclamp position.
2.2 change direction of the lever for clamp and unclamp in the safe operation condition.
3) Place Anti-Slip tape on the working floor
4 ) Set PM plan and spare part
5) Make reinforcement bar to hold fixture to table
6) Review design of trim that whether to improve to help operator easier cover
7) Training all concer about escalation process
8) Review Design of Fixture to improve ergonomic and safety issue