Introduction/Background
The City of Hollywood WTP requires additional treated capacity to service its existing and
developing customer base. Additional raw water supply to be able to produce additional treated
capacity is required in the short term. This request includes construction of two (2) new Floridan
Aquifer groundwater wells classified as proposed under existing Consumptive Use Permit (CUP).
These wells have previously been identified in the Lower East Coast Water Supply
Questionnaire. In addition, a new 2 MGD Reverse Osmosis (RO) train is required to be built to
increase treated capacity added to the distribution system from the Floridan water supply.
Proposed Floridan Aquifer production wells requested under this application have already been
characterized in the existing CUP. This project converts proposed production wells into existing
test production wells, augmenting available supply from the Floridan Aquifer. Plans to revise the
CUP accordingly are underway.
Construction of new 2 MGD RO train has limited permitting requirements which will be obtained
during the Bid Preparation stage indicated on the attached schedule. Hollywood RO system has
been designed and built for modular expansion. RO train to be constructed will be replication of
existing 2 MGD train and will be fabricated by skid supplier according to pre-established design
specifications.