The planed total capacity was covered by five 10 MW power plants, three of type T2, in municipalities Mali Idjos, Zrenjanin and Apatin, and two of type T1, in municipalities Odzaci and Srbobran (Fig. 2). The average electricity generation costs are 77.0 €/MWh, and range from 75.0 €/MWh for the plant type T2 located in MaliIdjos, to 80.0 €/MWh for the plant type T1 located in Srbobran.