1. Replacing the fire alarm control panel, meanwhile EST. was already repaired as well. 2. The sling of elevator no. 1 at high zone was replaced by Kone. 3. 12 V 7 Ah battery for power supply control of elevator no. 1 and no. 5 was changed. 4. Repair granite’s tile at the edge’s of the pond.