For perennial systems (other than pastures and meadows) certification of farm units as In conversion
to organic may be given where the operator has a verified minimum of 18 months of conformance
with the Standard. (Note, where IFOAM requirements are not required by the operator, a minimum of
12 months of conformance with the Standard for perennial systems is required prior to In conversion
to organic certification being granted.)