Subcontractor shall cause all Construction Equipment to be in sound operating condition and safe and fit for the purpose and use intended and to have a sufficient supply of spare parts to avoid delays in the Work resulting from loss of use. All Construction Equipment shall be subject to inspection from time to time by Contractor upon prior consultation with Subcontractor, for the purpose of ensuring conformity with the foregoing standard. Any such Construction Equipment that does not comply with the foregoing shall be promptly repaired or removed by Subcontractor and if removed shall be replaced at Subcontractor's expense with suitable Construction Equipment.