B.6.2.1 All labour related to the inspections and routine work scope of Article B.2.1 and B.2.2. Annex 1.
B.6.2.2 Hangarage, utilities, Aircraft movement within ADAT’s facility (towing) for the specified duration of the Check Aircraft reception, docking and staging for the planned maintenance works.
B.6.2.3 All labour related to the rectification of discrepancies (repairs) found from the routine task cards contained within the tally lists of Article B.2. up to five (5) man-hours per MPD task. For the sake of clarity for six (6) man-hours charged for 1 man-hour only. However this does not cover any repairs/ refurbishment deemed necessary for cosmetic reasons, non airworthiness reasons, or any tasks that require workshop maintenance or repairs/ refurbishment as per Component Maintenance Manual (CMM). This cut-off is not applicable for AD/SB/EO’s
B.6.2.4 Fuelling and Defueling assistance services at ADAT facility. (Cost of fuel will be to Customer account).
B.6.2.5 All routine tooling and standard general hand tools held within ADAT stores, but excluding special tools and tooling as may be required in Service Bulletins and Modification/Repair Orders.
B.6.2.6 All labour for on-aircraft functional checks as required, including leak checks, operational checks, and incoming/ outgoing checks and engine run-up as called out in the respective work package.
B.6.2.7 All consumable/expendable material costs (incl. oil, hydraulic fluids, grease, etc) as required for the routine maintenance check and defects arising from such inspections up to a cap of US Dollars xxxx ($xxxx/-) per line item
B.6.2.1 All labour related to the inspections and routine work scope of Article B.2.1 and B.2.2. Annex 1.
B.6.2.2 Hangarage, utilities, Aircraft movement within ADAT’s facility (towing) for the specified duration of the Check Aircraft reception, docking and staging for the planned maintenance works.
B.6.2.3 All labour related to the rectification of discrepancies (repairs) found from the routine task cards contained within the tally lists of Article B.2. up to five (5) man-hours per MPD task. For the sake of clarity for six (6) man-hours charged for 1 man-hour only. However this does not cover any repairs/ refurbishment deemed necessary for cosmetic reasons, non airworthiness reasons, or any tasks that require workshop maintenance or repairs/ refurbishment as per Component Maintenance Manual (CMM). This cut-off is not applicable for AD/SB/EO’s
B.6.2.4 Fuelling and Defueling assistance services at ADAT facility. (Cost of fuel will be to Customer account).
B.6.2.5 All routine tooling and standard general hand tools held within ADAT stores, but excluding special tools and tooling as may be required in Service Bulletins and Modification/Repair Orders.
B.6.2.6 All labour for on-aircraft functional checks as required, including leak checks, operational checks, and incoming/ outgoing checks and engine run-up as called out in the respective work package.
B.6.2.7 All consumable/expendable material costs (incl. oil, hydraulic fluids, grease, etc) as required for the routine maintenance check and defects arising from such inspections up to a cap of US Dollars xxxx ($xxxx/-) per line item
การแปล กรุณารอสักครู่..