Details for designation fee are as followed;
- Survey the area and inspect the existing reinforced concrete floor
- Survey the area and inspect the existing water system
- Plan designed for the defected concrete floor
- Plan designed for the renovated concrete floor
- Plan designed for the maintenant concrete floor
- Elevation designed for all concrete work
- Hydraulic level measurement for overall concrete floor
- Design the concrete floor to support Container Box area
- Design the concrete floor for washing yard and Container Box Maintenant area
- Design for water system and sanitary system
Details for marking in lay-out
- Transformer Installation point
- Drainage System
- Piping System (cold water pipe/ soil-waste water pipe)
Remark:
- Price is not include the fee for Soil Survey and Test
Term of Payment
- 50% payment when contract is signed
- 50% payment when final acceptance and project is delivered