Scenario Sc-1 (Fading scenario). This scenario represents management of MSW through landfill without biogas delivery alongside the composting process. In this scenario ( Fig. 3), MSWs are transported to the center, following a sorting process which is the same as the scenario Sc-0. Then, the organic fraction (which contributes 48% per ton of waste) is sent to the compost production plant for aerobic maturation and the rejected wastes (which contribute 48.96% per ton of waste) are sent to the landfill without biogas delivery and leachate treatment. The leachate and released biogas have been the main environmental challenges during the last years.