The Channel Tunnel was built by two teams of workers digging from both sides of the Channel. The work was started in 1987 and both teams raced to reach the middle of the tunnel first. They used huge machines,called 'borers', which could dig 75 metres a day. The amount of rock and dirt removed by these machines increased the size of Britain by 36 hectares!