The sizing of the WSP and CW are as in Table 1. The monthly average inflow to the WSP during the study time was 4192.5 m3/d and that of the CW was about 200 m3/d. The outflows were estimated to be 2452.6 m3/d and 134 m3/d for the WSP and CW respectively.