Costs for utilities, such as steam generation, water treatment and refrigeration, and all other input and output streams were compiled to calculate consumption-linked payments and revenues. Labor requirements for process equipment were considered to determine the work to be performed for the various types of installed process equipment (Ulrich, 1984). The costs that were used in the economic calculation are summarized in Table 2.