The equipment efficiency shall reach 95% (including 95%) of the maximum production efficiency.
If only due to Seller' s reasons, every 1% lower than 95% the Seller will pay the buyer penalty
1% of the total contract value. A period of two months wilr be given to seller for adjustment if the
max, efficiency of 9570 cannolbe reached during test. The time of two months will begin from the
date of the finarisation of the first efficiency test. Ir for the second tests, the seller' s still fail to
reach 95% the buyer can claim against the seller in accordance with clause 16 of the
contrat