Dear M. Muneer,
We finished reviewing your updated architectural layouts with the team. Below is a summary of the changes:
The columns will be minor changes, but for which we will need to update all layouts. The only major change from this updated structural layout will be as previously mentioned in the Spa reception. There is also an issue with the sink in the Powder Room on Floor 28. The sink no longer fits and we will need to review this.
The biggest change we picked up is on Floors 29 and 30. A new Guest Suite duplex type has been added with a Spiral Staircase. Previously, this was a large terrace.
Can you please confirm that this new type will be required, and if so what will be its designation as well as the operator’s requirements/brief.
We would appreciate your feedback today so that we can start working on these updates as soon as possible.
I look forward to hearing back from you,