A good understanding of the manual work is
needed as a background to automating the corresponding
task — floor tiling in the present case.
Consequently, this section will specify the performance
requirements from the tiling operation; describe
the manual work methods, including the tools
needed for them; and give the work inputs, as measured
in a field study.