All OHS & Environmental issues relating to work on-site and
subsequent removal to the Future Metals Recycling Depot
was agreed to in advance with SPAusNet prior to the project
proceeding. The Transformer was delivered to Future Metals
Recycling with no ensuing problems in transportation or
deconstruction, all metals (steel/copper etc) were recycled.
PROJECT MANAGEMENT
Future Metals Recycling takes great care in managing our
projects and has appointed a senior Project Manager.
Our Project Manager is an Electrical Engineer with over 30
years of High Voltage engineering and construction business
experience in Power Generation, Transmission and Distribution
Networks from hands on commissioning to project management
and senior management roles.
This experience was utilised to oversee all contractors on site to
ensure the safe, timely and efficient removal of the transformer.
EQUIPMENT USED ON SITE
s8-(OOK,IFT"INS
s4#RANE
s(EAVY(AULAGE3EMI4RAILER
s(OOK,IFT4RUCK/PERATOR
s0ETROLEUM4ANKER/IL2EMOVAL
External Service Providers utilised to facilitate the project
INCLUDEDEXPERIENCED#OMPANIES
s/VER$IMENSIONAL,IFT3HIFT/$,3
s0AISLEY0ETROLEUM
Prior to removal of the Transformer and in line with relevant
/(33TANDARDS
The Transformer Oil was tested, drained and handled by
Paisley Petroleum for recycling. The transformer was then
TRANSPORTEDBY/$,3TOOUR$ANDENONGFACILITYFORDE
TANKING
and recycling.
All loads are weighed on the Future Metals Recycling
weighbridge to provide accurate documentation for the client.
All OHS & Environmental issues relating to work on-site and
subsequent removal to the Future Metals Recycling Depot
was agreed to in advance with SPAusNet prior to the project
proceeding. The Transformer was delivered to Future Metals
Recycling with no ensuing problems in transportation or
deconstruction, all metals (steel/copper etc) were recycled.
PROJECT MANAGEMENT
Future Metals Recycling takes great care in managing our
projects and has appointed a senior Project Manager.
Our Project Manager is an Electrical Engineer with over 30
years of High Voltage engineering and construction business
experience in Power Generation, Transmission and Distribution
Networks from hands on commissioning to project management
and senior management roles.
ประสบการณ์นี้ไปใช้ในการดูแลผู้รับเหมาทั้งหมดบนเว็บไซต์
มั่นใจปลอดภัย ทันเวลา และ EF จึง cient การกำจัดของหม้อแปลง อุปกรณ์ที่ใช้ในเว็บไซต์
8 S - ( ยัง , IFT " อิน
s 4 #เรเน่
s ( eavy ( aulage3emi4railer
s ( ด้วย , ift4ruck / perator
s0etroleum4anker / il2emoval
ภายนอกให้บริการใช้เพื่ออำนวยความสะดวกโครงการ
includedexperienced # ompanies
/ s $ imensional IFT Ver , 3hift / $ 3
s0aisley0etroleum
ก่อนการกำจัดของหม้อแปลงไฟฟ้า และสอดคล้องกับที่
/ ( 33tandards ทดสอบน้ำมันหม้อแปลง , เนื้อและจัดการโดย
Paisley ปิโตรเลียมเพื่อการรีไซเคิล หม้อแปลงแล้ว
transportedby / $ , $ andenongfacilityforde 3toour
ลดฮวบและการรีไซเคิลทั้งหมดโหลดหนักในอนาคตโลหะรีไซเคิล
ใหญ่ต้องมีเอกสารที่ถูกต้องสำหรับลูกค้า
การแปล กรุณารอสักครู่..