The time invested in the management of branches and
tops varied significantly among alternatives C and S. If, as is
the usual practice, the residues were left in the centre of the
strip road (method C), this operation accounted for 6% of total
time, while the figure was 11% if the residual biomass was
bunched along the strip road sides using the harvesting head
(method S).