Before firing make sure the baffles have not been dislodged in transit. To achieve
maximum efficiency push the primary heat exchanger baffles in the direction of
the arrows as shown. The secondary heat exchanger spring baffles must be fully
inserted into the heat exchanger tubes (narrow end first).