To protect these walls from the impact of standing water, a 30cm raised concrete slab, as a base, had to be built first. The roof is a timber construction with composite roof tiles. The windows and doors, also made out of reused Timber, were later painted green & blue for the classroom and ochre for the office building. The materials used are locally available and well known for their users, which allows easy maintenance and results in low costs.