The initially assessed LOR is then reviewed and adjusted with due consideration according to the:
a) condition of particular equipment, which may range from brand/new/good condition to aged/obsolete/poor conditi on;
b) clinical operation impact of the equipment, which depending on the type of wards in which the equipment i s located and/or the patients on whom the equipment is used, may range from highly critical to less critical even for the same type of biomedical equipment.
c) occupational health and safety effect of the failed equipment to staff, patients, and the general public.
Once the LOR has been assessed and adjusted, proper risk treatment measures are considered. Risk treatment measures can be categorized into two different types in this case:
a) the maintenance level ; and b) the contingency plan.
The initially assessed LOR is then reviewed and adjusted with due consideration according to the:a) condition of particular equipment, which may range from brand/new/good condition to aged/obsolete/poor conditi on;b) clinical operation impact of the equipment, which depending on the type of wards in which the equipment i s located and/or the patients on whom the equipment is used, may range from highly critical to less critical even for the same type of biomedical equipment.c) occupational health and safety effect of the failed equipment to staff, patients, and the general public.Once the LOR has been assessed and adjusted, proper risk treatment measures are considered. Risk treatment measures can be categorized into two different types in this case:a) the maintenance level ; and b) the contingency plan.